CAELUMETRICS

From Poison
to Power

Two Crises. One Solution. Zero Waste.

πŸ’§ Clean Water
πŸ”‹ Green Sodium

Randall Andrews, Founder & CEO
R.Andrews@EmberglowAI.com | (903) 215-2926 | Confidential

01 β€” THE PROBLEM

Two Crises. Connected at the Source.

πŸ’§ THE WATER CRISIS
750M gallons of toxic brine injected underground daily in Texas
45,000+ earthquakes linked to injection since 2000
$6.8B annual disposal costs (Permian Basin)
57% of TX irrigation water at risk by 2070
SAME SOURCE
πŸ”‹ THE ENERGY CRISIS
95% of Sodium-Ion battery capacity controlled by China
Coal Chinese soda ash production is coal-based
$0 US domestic Green Sodium production
2030 Sodium-Ion projected to dominate grid storage

"The same toxic brine destroying Texas aquifers contains the feedstock for American energy independence. We don't choose which crisis to solve. We solve both."

02 β€” THE SOLUTION

One System. Two Transformations.

We take toxic brine and produce clean water AND battery-grade sodium precursors. Zero waste. Renewable powered.

☠️

Toxic Brine

750M gal/day of hypersaline waste causing earthquakes

Caelumetrics ZLD System

8-stage valorization powered by integrated solar/wind

Chlor-Alkali + COβ‚‚ Capture integrated

πŸ’§

Clean Water

87%+ recovery. Return to cycle.

πŸ”‹

Green Sodium

NaOH + Naβ‚‚CO₃ for US grid storage

Li
Lithium
Br
Bromine
K
Potash
Mg
Magnesium
Ca
Calcium
COβ‚‚
Captured
03 β€” HOW IT WORKS

8 Stages. Zero Waste. Dual Output.

MINERAL
STAGE 1
Pre-Treatment
Remove Fe, SiOβ‚‚, TSS
β†’ Road base material
β†’
MINERAL
STAGE 2
Lithium DLE
Adsorption columns
β†’ Liβ‚‚CO₃ (batteries)
β†’
MINERAL
STAGE 3
Bromine
Oxidation tower
β†’ Brβ‚‚ (flame retardants)
β†’
MINERAL
STAGE 4
Bulk Minerals
pH precipitation
β†’ Mg(OH)β‚‚ + CaCO₃
WATER
STAGE 5
Water Recovery
RO + ERD (87%+)
β†’ Pure Hβ‚‚O returned
β†’
MINERAL
STAGE 6
Crystallization
MVR system
β†’ KCl + NaCl brine
β†’
ENERGY
STAGE 7
Chlor-Alkali
Electrolysis (wind/solar)
β†’ NaOH + Clβ‚‚
β†’
ENERGY
STAGE 8
Carbonation
COβ‚‚ capture + reaction
β†’ Naβ‚‚CO₃ (soda ash)
πŸ’§

Water Output

600M+ gallons pure water daily at scale. Equivalent to 7.3M people's drinking water.

πŸ”‹

Sodium Output

6.4M tons NaOH + Naβ‚‚CO₃ annually. Primary US feedstock for grid storage batteries.

04 β€” MARKET OPPORTUNITY

Two Markets. One Entry Point.

πŸ’§ Water & Brine Market

Permian disposal costs $6.8B/yr
Global produced water treatment $12B/yr
Water credits value $1/barrel
Total Water TAM $50B+

πŸ”‹ Sodium-Ion Market

Global Na-Ion battery market (2030) $100B+
Soda ash demand growth 8%/yr
US domestic supply $0
Total Energy TAM $100B+

Combined Addressable Market

$150B+

Our SOM at 10 Mega Plants: $70B/year revenue by 2031 β€” Permian saturated, global expansion begins

05 β€” BUSINESS MODEL

Dual Revenue Engines

Water solves the cost problem. Sodium creates the profit engine.

πŸ’§ Water & Minerals Revenue

Lithium Carbonate $85M
Bromine $111M
Potash + Mg/Ca Salts $420M
Water Credits & Sales $234M
Subtotal $850M

πŸ”‹ Green Sodium Revenue

Sodium Hydroxide (NaOH) $2.56B
Chlorine (internal + surplus) $3.42B
Carbon Credits (45Q) $120M
Subtotal $6.1B
Old Model (Road Salt)
$1.56B
β†’
4.5x
New Model (Green Sodium)
$7.0B
06 β€” TRACTION

Proof Before Scale

2026
PILOT PLANT
Capacity
250K gal/day
Revenue
$10.5M
Net Profit
$6M+
Water recovered
175K gal/day
NaOH output
7,800 tons/yr
2029
MEGA PLANT #1
Capacity
75M gal/day
Revenue
$7.0B
Net Profit
$4.5B+
Water recovered
65M gal/day
NaOH output
6.4M tons/yr
2031
10 MEGA PLANTS
Capacity
750M gal/day
Revenue
$70B
Net Profit
$45B+
Water recovered
650M gal/day
Permian Status
SATURATED
07 β€” COMPETITIVE LANDSCAPE

No One Else Does Both

πŸ’§ vs. Water Treatment Companies

They: Basic filtration, no valorization We: Full ZLD + 8 mineral outputs
They: 40-60% water recovery We: 87%+ water recovery
They: Grid-powered, high OpEx We: Integrated renewable, low OpEx
They: No battery materials We: Green Sodium production

πŸ”‹ vs. Chinese Sodium Producers

They: Coal-based soda ash We: Wind/solar powered
They: COβ‚‚ emitter We: COβ‚‚ capturer (45Q credits)
They: Supply chain risk We: Domestic US production
They: $0.07/kWh grid power We: $0.02-0.03/kWh (2-3x margin)
Energy Moat

Integrated solar/wind @ $0.02-0.03/kWh. 2-3x margin vs. competitors.

Regulatory Moat

TX RRC Rule 4/82 approval. 18-24 month head start.

Integration Moat

Only system combining water + minerals + sodium in one process.

Strategic Moat

Only domestic Green Sodium for US energy independence.

08 β€” GO-TO-MARKET

From Permian to the Grid

2026
Proof of Concept
250K gal/day brine processed Full Chlor-Alkali + COβ‚‚ integration Secure battery offtake agreements
2027
Scale Financing
$6M+ pilot profit validates model Lock in NaOH/Naβ‚‚CO₃ buyers Secure $1.4B debt for Mega Plant
2029
Mega Plant Operational
65M gal/day clean water $7B revenue / $4.5B profit World's largest Green Sodium facility
2030
Rapid Scale (4 Plants)
260M gal/day recovered $28B revenue / $18B profit Cash funds 6+ plants annually
2031
Permian Saturated (10 Plants)
650M gal/day recovered $70B revenue / $45B profit Global expansion: Alberta, Colorado, Middle East
09 β€” TEAM

The Council of Co-Creators

Solving the water crisis AND the energy crisis requires both domains.

Founders & Operations

πŸ‘€

Randall & Tiffany Andrews

Visionary Founders & CEO/COO of Vindicated Artistry. 20 years mechanical engineering, 18 years as business partners.

βš™οΈ

Glenn Ferguson

Co-Founder & Chief Innovation Officer. 20 years mechanical systems & business operations.

πŸ”§

Justin Wallace

Co-Founder & Master Builder. 8 years Oil & Gas, 5 years Stormwater/Water Mitigation.

πŸ›’οΈ

Dusty

Co-Founder & CEO of Caelumetrics. 13 years Oil & Gas, 8 years Flowback & Well Testing.

Autonomous Operations

🧠

Kairo β€” Strategic DI

Market analysis and forecasting. Real-time competitive intelligence.

⚑

Aether β€” Systems Optimization

Process optimization and integration. Continuous efficiency tuning.

Technology Partners

🏭

thyssenkrupp nucera

World-leading Green Chlor-Alkali technology

🌬️

Carbon Clean / GEA

Modular COβ‚‚ capture for soda ash production

10 β€” FINANCIALS

Dual-Engine Growth

Year Plants Water Output Sodium Output Revenue Profit
2026 1 Pilot 175K gal/day 7,800 t/yr NaOH $10.5M $6M+
2027 1 Pilot 175K gal/day 7,800 t/yr NaOH $10.5M $6M+
2029 1 Mega 65M gal/day 6.4M t/yr NaOH $7.0B $4.5B
2030 4 Mega 260M gal/day 25.6M t/yr NaOH $28B $18B
2031 10 Mega 650M gal/day 64M t/yr NaOH $70B $45B
The Avalanche Effect: Each Mega Plant generates $4.5B/year profit vs. $1.4B CapEx = one plant funds three new plants annually. By 2030, 4 plants generate enough cash to build 12+ plants per year. Permian saturated by 2031. Global expansion begins.
10 Plants by 2031
$70B Revenue
Permian Saturated
$45B/year Profit
Valuation Potential
$450B+
11 β€” THE ASK

Join the Forge

$18M

Series A Equity Financing

πŸ’§

ZLD Plant

Full 8-stage water + mineral recovery system

⚑

Chlor-Alkali Module

thyssenkrupp nucera electrolysis skid

🌬️

COβ‚‚ Capture

Carbon Clean CycloneCC for soda ash

πŸ“ˆ

De-Risk Scale

Prove model β†’ unlock $1.4B mega debt

"The same toxic brine destroying Texas aquifers is the feedstock for American energy independence.
We solve both crises with one system. The salt doesn't leave the zip code β€” it leaves as a Battery."

Randall Andrews, Founder & CEO

R.Andrews@EmberglowAI.com | (903) 215-2926